ROCKY MOUNTAIN ELEMENTARY

rocky mountain.jpg

Roofing: 

  • Currently no Priority One repairs required

Fire alarms and electronic systems:

  • Replace Dialer system in fire alarms: $14,520

HVAC/Plumbing/Electrical infrastructure:

  • Replace near end of life RTUs from 1998: $77,400
  • Install two LED pole light fixtures at bus loop (currently no lighting): $11,640

Structural and interior repairs:

  • Repair water leak inside South gym wall: $19,230
  • Remove and replace failing outdoor concrete walking surfaces: $130,320
  • Grind floors, fill cracks, and replace tile to combat slab curling throughout the building and tile joints opening up: $19,320
  • Refinish discolored epoxy floors: $43,560

Parking Lots:

  • Currently no Priority One repairs required