GRAND MESA MIDDLE

grand mesa.jpg

Roofing: 

  • Replace near end of life Main Building roof with EPDM: $2,204,880

Fire alarms and electronic systems:

  • Currently no Priority One repairs required

HVAC/Plumbing/Electrical infrastructure:

  • Replace boiler system (stacks are not code compliant): $125,760

 

Structural and interior repairs:

  • Polish and apply concrete sealer to peeled up Tech Ed floors: $19,320
  • Overlay worn out synthetic gym floor with sports floor: $212,760
  • Refinish poor condition epoxy floors in restrooms: $21,720

Parking Lots:

  • Major cracking requires overlay and restripe: $391,680