FRUITA MONUMENT

fruita monument.jpg

Roofing: 

  • Replace near end of life South wing roof with EPDM: $232,080
  • Replace near end of life library roof with EPDM: $389,880
  • Replace near end of life Office/Auditorium roof with EPDM: $280,800
  • Replace near end of life Music roof (EPDM): $76,560
  • Replace near end of life Music roof (metal paneling): $41,760
  • Replace near end of life Computer Lab roof with EPDM: $62,640
  • Replace near end of life Ag Shop roof with EPDM: $162,480
  • Replace near end of life Classroom Annex roof with EPDM: $290,160

Fire alarms and electronic systems:

  • Replace and standardize failing clock system campus-wide: $531,840

HVAC/Plumbing/Electrical infrastructure:

  • Provide adequate make-up air to kitchen: 29,040
  • Add and update exhaust systems in restrooms and locker rooms: $48,360

Structural and interior repairs:

  • Replace badly spalled concrete in Plaza and other areas: $58,080
  • Remove and recoat failing epoxy floor in Main South entry: $14,520
  • Refinish poor condition epoxy floors in locker rooms: $61,290
  • Replace failing bleachers in North Gym: $137,280
  • Replace poor condition sheet vinyl in restrooms: $19,680
  • Design and build a secure Main Entrance (currently dysfunctional and not secure): $2,000,000

Parking Lots:

  • Major cracking requires overlay and restripe: $798,960