CLIFTON ELEMENTARY

Roofing: 

  • Replace near end of life Annex roof with EPDM: $34,800
  • Replace near end of life Annex roof shingles: $206,520
  • Replace near end of life Pump house roof: $2,280

Fire alarms and electronic systems:

  • Replace and standardize failing clock system campus-wide: $155,880
  • Replace entire fire alarm system (current system not code compliant): $259,800
  • Replace failing intercom system: $207,720

HVAC/Plumbing/Electrical infrastructure:

  • Replace hand washing stations in poor condition: $58,080
  • Replace failing kitchen grease trap: $67,416
  • Replace failing Annex and modular boilers: $232,080
  • Replace failing RTU in Annex: $193,440
  • Repair numerous miscellaneous plumbing issues: $23,160

Structural and interior repairs:

  • Remove and replace failing outdoor concrete walking surfaces: $74,880
  • Remove asbestos flooring (VAT) and replace with carpet in classrooms: $242,520

Parking Lots:

  • Major cracking requires overlay and re-stripe: $200,160
  • Replace failing pavement with concrete at Kitchen and Dumpster areas: $15,120