CLIFTON ELEMENTARY

Roofing: 

  • Replace near end of life Annex roof with EPDM: $34,800 - COMPLETE

  • Replace near end of life Annex roof shingles: $206,520 - COMPLETE

  • Replace near end of life Pump house roof: $2,280 - COMPLETE

Fire alarms and electronic systems:

  • Replace and standardize failing clock system campus-wide: $155,880 - COMPLETE

  • Replace entire fire alarm system (current system not code compliant): $259,800 - COMPLETE

  • Replace failing intercom system: $207,720 - COMPLETE

HVAC/Plumbing/Electrical infrastructure:

  • Replace hand washing stations in poor condition: $58,080 - COMPLETE

  • Replace failing kitchen grease trap: $67,416 - COMPLETE

  • Replace failing Annex and modular boilers: $232,080 - COMPLETE

  • Replace failing RTU in Annex: $193,440 - COMPLETE

  • Repair numerous miscellaneous plumbing issues: $23,160 - COMPLETE

Structural and interior repairs:

  • Remove and replace failing outdoor concrete walking surfaces: $74,880 - COMPLETE

  • Remove asbestos flooring (VAT) and replace with carpet in classrooms: $242,520

Parking Lots:

  • Major cracking requires overlay and re-stripe: $200,160 - COMPLETE

  • Replace failing pavement with concrete at Kitchen and Dumpster areas: $15,120 - COMPLETE