ADDITIONAL DISTRICT-WIDE REPAIRS

admin building.jpg

Roofing: 

  • Currently no Priority One repairs required

Fire alarms and electronic systems:

  • BTK
  • Replace entire fire alarm system (currently not code compliant): $48,360
  • Career Center
    • Replace dialer system in fire alarms: $14,520
    • Replace failing intercom system: $146,400 
  • Maintenance Building
    • Replace dialer system in fire alarms: $14,520 
  • Warehouse:
    • Replace dialer system in fire alarms: $14,520

HVAC/Plumbing/Electrical infrastructure:

  • Career Center
    • Remove and replace failing outdoor concrete walking surfaces: $74,880
    • Remove and replace damaged VCT in South hallway: $33,708

Structural and interior repairs:

  • Currently no Priority One repairs required

Parking Lots:

  • Administration Building
    • Major cracking requires overlay and re-stripe: $569,160
  • Warehouse
    • Major cracking requires overlay and re-stripe: $16,800